C C P
CCP is short for Critical Control Point
90% of all Structural Waterproofing is about the CCP's

If you don't find
the Structural DETAIL / CCP you need,
we can make it for you, based on YOUR project conditions 1:1
Click here to learn more
WATERPROOFING CCP (DETAILS) LIBRARY:
Global Waterproofing Improvements
A Cold joint is typically defined as concrete being cast together on-site. That way you have a fresh concrete being poured against a cured concrete.
The different state of curing causes several waterproofing challenges.
A Prefab joint is typically defined as as two (or more) cured concrete panels/blocks being cast together on-site. That way you have a fresh concrete being poured between two or more pieces of cured concrete. The different concrete quality plus the casting methods causes severe waterproofing challenges.
Structural parts for different reasons not allowed to touch can be a huge problem on both long and short terms.
Thinking twice is a good idea.
Tie bolts come in many different variations leading to many different waterproofing requirements because of the many different combinations of challenges.
Waterproofing ACADEMY aims to remove OverKill, UnderKill, and Incompetence
- simply because we care