- the project's waterproofing info kept in one place!

LESS WATERPROOFING - BETTER STRUCTURES
"..afterthought, after, is easy
afterthought, in advance
that's the key to successful balanced waterproofing"

DEMO CONTENT

DO NOT COPY - ALWAYS DESIGN WATERPROOFING SOLUTIONS FROM GROUND UP 

total model med

OVERALL PROFILE


Basement, Lift pit, New Build, GroundWater, Radon, Pollution, Highly sensitive, Medium sensitive  


OBSConstant alignment to reality is key

 

START

 

1234 - YOUR PROJECT NAME




WaterProofing Quality Chain©

SERVING THE INTERESTS OF THE STRUCTURE

- because that serves the interests of both owner, specifier, and contractor

PROJECT COMMUNICATION FORM:

 

PROJECT ID: 1234 - "YOUR PROJECT NAME "

 

This email address is being protected from spambots. You need JavaScript enabled to view it.

 

FORM SAMPLE

 



pilotstages
Process Example

WP: WaterProofing
CCP: Critical Control Point
OWA: Own Waterproofing Ability
QA/QC: Quality Assurance / Quality Control
STOP/GO: QC points where the Quality Level must be approved before continuing
AM/SC: Application Manual / Self Control

PLEASE NOTE:
This document serves inspirational purposes only. Your actual project may require less, or more, or different, content.
Copy/Paste of waterproofing solutions is in general a bad idea because waterproofing is very much about getting small details right,
and details vary from structure to structure - no matter how similar they might seem to be.
BEST ADVISE: build your solution from scratch - every time. It may take a little longer and require some independent input, but it's worth the effort.