Image
Image

POWERFUL CONTENT

FOR YOUR NEXT TEAM MEETING

STOCK TOPIC NO. 2

Image

WATERPROOFING VERSION 2

wpp CONTRACTOR- the job site perspective

Image
Image

TARGET GROUP(S): Owners, Specifiers, QC Inspectors, and Students

PLATFORM: Internet (1:1 to Individuals/Hybrid or to your Conference room)

DURATION: 60 min. + QA

LANGUAGE OPTIONS: 

Image

AFTER THE SESSION:

When the session is over, all attendees will receive:

  • copies of the content used to illustrate

  • a topic-related checklist tool to use in real-life situations

 WPP tools

CONNECTING DECISION AND LIABILITY
WILL POSITION YOU MUCH STRONGER...

... it reduces your risk of failure
and it improves your projects economy!

LEARNING OBJECTIVES:

  • Distance / Reduce risk of Liability

  • Stabilize the project outcome

  • Reduce risk of project delays

  • Improve the waterproofing QUALITY

  • Position yourself for a less vulnerable role in the project

  • Increase your core competencies

  • Make a better job and do it easier

  • Contribute to the overall Sustainability
    simply by making better and less expensive solutions.

CONTENT:

  • The "un-healthy culture" of structural waterproofing

  • Why You should want this change to take place - from your company's point of view

  • The impact this will have on the relationship to the Owner, and to the general Specifier

  • How poor waterproofing solutions are made on the job-site

  • Why poor structural waterproofing has been accepted for so long

  • The 3-point pressure

  • The Waterproofing V2 method

  • SHOW-CASE: a Demo

  • Q & A

REQUEST A PROPOSAL

There are no obligations or commitments involved.
Just fill out and submit the form below, and we will come up with something good.

Please fill the required field.
Please fill the required field.
Please fill the required field.
Please fill the required field.
Please fill the required field.
Image